Floor Maintenance:
RGN - Roger Guindon (Smyth 451): Mon, 09/08/2025 to Fri, 09/19/2025
Impact: The premises will not be accessible from 23:00 to 07:00. Work may last up to two days. There will be no impact on access to the building during the day.
Additional information: Please remove all personal belongings from the floor. A slight chemical odor may be present in the air for the first 48 hours following maintenance.
Alternative route: Not applicable for this shutdown.
For more information, please contact: Team RSS at [email protected].
Building affected: STE - SITE - King Edward 800
Shutdown Details: Entrance Closure
Duration of interruption: Mon, 08/25/2025 - 07:00
Duration of interruption: Fri, 10/17/2025 - 17:00
Impact: The main building entrance at level 00 will be closed and an alternative entrance will be provided during the time period. Refer to the document attached for details.
Alternative route: Not applicable for this shutdown.
For more information, please contact:Christian Gremli at [email protected]
Building affected: TBT - Tabaret - Cumberland 550
Shutdown Details: Ventilation shutdown
Duration of interruption: Tue, 09/09/2025 - 10:00
Duration of interruption: Fri, 09/19/2025 - 17:00
Impact: Due to ongoing mechanical work, the ventilation system will be shutdown in some offices. There will be no ventilation in rooms C202, C205, C206, C207, C208, and C210.
Alternative route: Not applicable for this shutdown.
For more information, please contact:Salam Cheikh at [email protected]
Building affected: RCR - Residential Complex - University 90
Shutdown Details: Water shutdown
Duration of interruption: Mon, 09/15/2025 - 07:00
Duration of interruption: Mon, 09/15/2025 - 08:00
Impact: Water pressure will be reduced on the 7th floor and above during the shutdown.
Alternative route: Not applicable for this shutdown.
For more information, please contact:Steve Daigle at [email protected]
Building affected: TBT - Tabaret - Cumberland 550
Shutdown Details: Electrical shutdown
Duration of interruption: Wed, 09/17/2025 - 17:00
Duration of interruption: Thu, 09/18/2025 - 20:00
Impact: A building panel will be shut down. Power will be unavailable in rooms M081, M083, M086, and in the office area of M088.
Alternative route: Not applicable for this shutdown.
For more information, please contact:Kyle Clemens at [email protected]
Building affected: ARC - Advanced Research Complex - Templeton 25
Shutdown Details: Electrical shutdown
Duration of interruption: Wed, 09/17/2025 - 06:00
Duration of interruption: Wed, 09/17/2025 - 08:00
Impact: A building panel will be shut down. Outlets in rooms 305 and 338 will lose power during the shutdown. Emergency power will not be affected.
Alternative route: Not applicable for this shutdown.
For more information, please contact:Devin McGirr at [email protected]
Building affected: THN - Thompson Residence - University 45
Shutdown Details: Ventilation Shutdown
Duration of interruption: Wed, 09/17/2025 - 07:30
Duration of interruption: Wed, 09/24/2025 - 17:00
Impact: HVAC system will be shut down for duct cleaning on the 1st and 2nd floor. No air flow during duct cleaning.
Alternative route: Not applicable for this shutdown.
For more information, please contact:Kevin Couture at [email protected]
Building affected: MRT - Morisset - Universit茅 65
Shutdown Details: Elevator Shutdown
Duration of interruption: Fri, 09/19/2025 - 06:00
Duration of interruption: Fri, 09/19/2025 - 08:00
Impact: Elevators A and C will be out of service for renovations.
- Level 00 will not be accessible.
- To access level 0 in MRT, please go to UCU's level 0, and then access MRT through the passageway.
- To access level 2 in MRT, please go to UCU's level 2, and then access MRT through the passageway.
Alternative route: View alternative routes.
For more information, please contact:Martin Faubert at [email protected].